Kazakhstan talks about possible referendum on nuclear power plants

No time to read?
Get a summary

Shavkat Utemisov, a member of Kazakhstan’s Central Election Commission, announced that the CEC will be ready if they want to hold a referendum on the construction of a nuclear power plant (NGS) this year. This has been reported DEA News.

“All the necessary preparatory work, including the compilation of the voter lists and the work that our regional election commissions have to do, everything is going as planned, we are ready,” the commissioner said.

However, Utemisov has not yet specified the preliminary dates for the start of this referendum.

“We are ready, of course we will have time,” he concluded.

Other details regarding the possible referendum on nuclear power plant construction in Kazakhstan were not given.

It was learned that the Constitution of Kazakhstan will be amended in the referendum held last year. supported Almost 77 percent of the electorate. According to a survey conducted by the Comprehensive Social Research Institute SOCIS-A, 76.7% of Kazakhstanis voted for changes to the country’s constitution.

Kia’s former Russia office discovered in Kazakhstan.

No time to read?
Get a summary
Previous Article

Voted the most popular crossovers in Russia

Next Article

Formula 1 driver announces he is ready to take the stage at Eurovision 2024