During the reconstruction work at Testovskaya D1 station, rail services will face schedule adjustments over two weekends in September. Specifically, on September 9 and 10, as well as September 16 and 17, trains traveling in the Belorussky and Savelovsky directions will experience temporary changes in their routes and frequency. These planned changes are part of the broader effort to upgrade the transport corridor serving the northern and central parts of Moscow, aiming to minimize long term disruption while maximizing passenger convenience once the new facilities are in place.
According to information released by the Moscow Ministry of Transport, most trains in the affected directions will be canceled after 22:00 and will resume operations by 11:30 the following morning. On these days a portion of services will be extended, creating intervals of up to about fifty minutes between trains. Several trains will maintain limited stops, with certain services skipping stops at Slavyansky Boulevard, Testovskaya, and Begovaya to streamline overall travel times and align with the improved network design. This approach seeks to balance temporary service reductions with reliable access to essential routes for commuters and travelers alike.
Regarding Aeroexpress services to Sheremetyevo International Airport, the plan outlines changes for the mornings of September 10 and 17 when some trains will depart from Savelovskaya with a scheduled stop at Okruzhnaya. Additionally, on September 9 and 16, a subset of early morning and late evening flights will operate from Savelovskaya as part of the same operational window. These adjustments are coordinated to reduce crowding at key transfer points and to preserve a consistent flow between the airport, central districts, and the satellite rail network during peak travel periods.
The stated objective behind the Testovskaya D1 station reconstruction is to establish a modern transport hub that seamlessly connects the newly refurbished D4 station, the Moscow Central Circle, and multiple metro lines. The upgraded hub is intended to improve interchange options, shorten transfer times, and provide a more intuitive travel experience for residents and visitors navigating the city’s expanding transit system. The project reflects a broader strategic push to integrate existing rail and metro assets into a more cohesive and efficient network that supports growing demand across Moscow and its surrounding regions.
City officials have consistently emphasized the importance of a well connected transit node at the airport corridor, highlighting plans for a timely completion that will unlock faster and more convenient access to both business districts and residential areas. As the network evolves, riders can anticipate clearer signage, streamlined ticketing options, and more reliable service connections that reduce overall travel time while maintaining a high standard of safety and comfort during reconstruction. Local authorities reaffirm their commitment to minimizing the impact on daily commutes and to delivering a robust, future ready metro and rail interface for the metropolitan area.
In summary, the route adjustments tied to the Testovskaya D1 reconstruction reflect a careful balance between short term inconveniences and long term gains. By preserving essential service where possible, reconfiguring certain stops, and coordinating with Aeroexpress operations, the project aims to deliver a transformed transport corridor that enhances accessibility, connectivity, and resilience for travellers across Moscow and its neighboring regions. The initiative underscores a forward looking vision for a city where rapid, reliable transit options are increasingly integrated into daily life and economic activity, even as essential infrastructure undergoes modernization.