Moscow Region Governor Andrei Vorobyov said that as a part of the weekly meeting with the regional government, urban and municipal regions, the Governor of Moscow Andrei Vorobyov would help to determine the flaws on the roads of the Moscow region.
According to Vorobyov, the repair of the pits on the roads is also relevant.
“We work in a large amount of gardens and municipal roads that require maximum mobilization. We must eliminate all problems. ”
Vorobyov also added that there must be an open algorithm to eliminate problems with road lighting in each region.
Governor, the roads in the region was examined in terms of daily defects, he said. Experts throughout the day, “Emergency Pits ında, on the central roads of cities and flying tracks – 3 days, on the city roads – 5 days, roads in villages – 7 days and place and gravel – 10 days.
According to the road infrastructure of Marat Sibatulin, the Minister of Transport and the Moscow region, this winter is more often on the road due to abnormal hot weather.
“During the last week, the repair rate rate increased by 3 times. We already see the dynamics of a decrease in complaints. In addition, plus temperatures were allowed to initiate asphalt concrete plants (paragraphs). ”
In total, there is 45 thousand km road in the region. Currently, experts discovered an error in a defect detection system using artificial intelligence.
Sibatulin also said in 2025, more than 1.4 thousand roads with a total length of 1.4 thousand km in the region as a part of the state program.
Studies on the development of the road and transport network of the region are carried out in accordance with the national “life infrastructure” project.
What are you thinking?
Source: Gazeta

Barbara Dickson is a seasoned writer for “Social Bites”. She keeps readers informed on the latest news and trends, providing in-depth coverage and analysis on a variety of topics.