RWE: First LNG tanker from USA arrives at terminal in Wilhelmshaven, Germany

No time to read?
Get a summary

The first liquefied natural gas (LNG) tanker from the USA has arrived at the recently opened LNG terminal in Wilhelmshaven, Germany. This was reported by the energy company RWE, which signed a contract with the American company Sempra Infrastructure for the supply of 2.25 million tons of LNG per year. TASS.

It was noted that the Maria Energy tanker stopped at Wilhelmshaven, where the liquefied gas would be reloaded into a floating terminal, after which the fuel would be converted into gas and pumped into the German gas pipeline network.

Germany’s first LNG terminal in Wilhelmshaven opened in mid-December with the participation of German Chancellor Olaf Scholz.

As before Wrote Citing a report by the German parliament, Bloomberg believes the German government believes that replacing Russian gas will cost the country about 45.4 billion euros.

No time to read?
Get a summary
Previous Article

Former sailor from United States receives $100,000 for training Chinese pilots to land on an aircraft carrier

Next Article

Authorities denied reports that mobilized from Saratov region died in Makeevka