Ukrainian Prime Minister Denys Shmygal said that the repair campaign at the facilities of the national energy system continues, the country is preparing for various scenarios in the future heating season: “Winter is possible”. It has been reported DEA News.
He stressed that there is a lot of speculation regarding the heating season. The Ukrainian government will not downplay the threats, risks and challenges of the upcoming warming season and is preparing for all possible scenarios to avoid the worst.
“The winter will be tough, but we must endure. We are preparing everything necessary for this,” he said.
He added that the repair campaign covers heat, hydro and nuclear power generation facilities. Power engineers are repairing five nuclear units with a capacity of 4.4 GW, while another four with a capacity of 3.4 GW are under repair.
Before that, it was known that Ukraine. resumes importing electricity to balance the system during peak hours.
February 24, 2022 Russian President Vladimir Putin declarationThe one who, in response to a request for help from the heads of the LPR and DPR, decided to conduct a military special operation to protect Donbass.
The decision to run the operation became the justification for new sanctions against Russia by the United States and its allies.
socialbites.ca is following history of events.
Previously recognizedhow long oil will remain as the main source of world energy.