Rostec announced that the development of the PD-35 engine was delayed for two years

No time to read?
Get a summary

The development period of the promising PD-35 engine for civil aviation was delayed by two years due to current events and the need to increase the production of other engines. TASS With reference to the representative and general designer of JSC United Engine Corporation Alexander Inozemtsev.

“According to the PD-35, we had scheduled deadlines. [разработки] until 2027–2028. Now in connection with all events [сроки] Funds have now shifted to the right for several years as PD-14 is redistributed to increase PD-8 volumes. This is a mandatory measure, but nothing stands still,” Inozemtsev said on the sidelines of the Perm Engineering and Industry Forum.

Sergey Chemezov, former Managing Director of Rostec State Corporation declarationHe said that investment in the development of the PD-35 engine, which should propel new Russian wide-body aircraft, has decreased, but that the project will be implemented.

No time to read?
Get a summary
Previous Article

Commentator Orlov on the World Cup in Qatar: world championships should be held in civilized countries

Next Article

Pentagon signs $431 million contract with Lockheed Martin to manufacture MLRS HIMARS